• Description:
    This project will provide connection from Engstrom Road to a segment of Trunk Road north of the Trunk-Bogard roundabout, reducing heavy traffic on Engstrom Road.
  • Benefits:
    This project intends to improve safety and increase the capacity of the road network in the Fishhook area by providing an alternate route between Engstrom Road and Trunk Road. The proposed connection would provide an alternative route and reduce traffic congestion on Engstrom Road.
  • Status:
    A reconnaissance engineering report has been completed. Preliminary field investigations and engineering efforts are ongoing.
  • Cost:
    Estimated total cost: $19,200,000.
  • Schedule:
    Construction is dependent on funding.