Many new homes near scenic Machetanz Elementary will soon have a higher capacity direct road for access. The new Trunk Road Extension South will connect subdivisions south of the Parks Highway. The 1.5 mile project will eliminate an at-grade crossing with the railroad with the installation of a new bridge, improving safety for the area as well. The new road will remove busy school traffic from congested subdivision roads.
A ribbon cutting is planned for Aug. 11, at 11:30 am. at the railroad bridge.
Watch the aerial video of the project from its beginning here. Paving is nearly complete. Video and music by Borough Media Specialist Stefan Hinman.
Read the factsheet on Trunk Road South here:
https://www.matsugov.us/projects/trunk-road-extension-south
For more info, email Patty Sullivan, Public Affairs Director at This email address is being protected from spambots. You need JavaScript enabled to view it.