Matanuska-Susitna Borough

Lucille Street Culvert Replacement & Flood Hazard Mitigation

Scope

This project replaces an existing culvert from a 36 inch diameter culvert to a 72 inch diameter culvert. Increasing the diameter of this culvert will reduce flooding on the headwaters side of a creek where private residences are located.

  Lucille Street Culvert before the flood 2  

 

 Lucille St Culvert During the flood 2012

This project will also increase the slope of the culvert slightly to encourage water flow downstream. The existing culvert is exposed on one side and is damaged by ATV traffic. The upgrade will also bury the new culvert and protect it from damage. This project will require the relocation of utilities.

    Lucille St culvert damaged

Project Benefits

This project:

  • Reduces flood risk upstream
  • Protects the nearby neighborhood from future flood events
  • Will protect the new culvert from ATV traffic damage

Project Status

A 95% design plan set is complete. Currently in the process of applying for a Hazard Mitigation Grant from FEMA to cover the remaining design and construction costs.

Contacts

Mike Campfield, MSB Project Manager

1-907-861-7719

This email address is being protected from spambots. You need JavaScript enabled to view it.

Brad Sworts, Manager

Pre-Design & Engineering Division

1-907-861-7715

This email address is being protected from spambots. You need JavaScript enabled to view it.

Project Docs

Project Fact Sheet - October 2020 (pdf 338.01 KB)   |  848 hits

Project Cost

Design: $25,300
Construction: $126,800
Utility Relocates: $118,630

Total Estimated Project Cost: $270,760